Site menu:

Site search

Categories

Recent Comments

Archives

Outline Design Work for Flood Defences at the Hythe Ranges commences!!!

The Environment Agency is now working on an outline design for flood defence works at Hythe Ranges and would like to talk to the local community about our draft designs. The line of the new defences will follow the existing coastal defences between Dymchurch Redoubt and Fishermens’ Beach. The attached map shows the frontage that the project will cover.

The Environment Agency would like to invite you to attend a public drop in session at their Floodline Trailer on 18 March 2015 from 11am to 6pm at Waitrose Hythe, Prospect Road, Hythe, Kent. CT21 5NH.

Drop in sessions for the other projects mentioned in the newsletter will be happening between now and the summer.

Please feel free to pass on this information to others who might be interested in the project. If they would like to be added to ¬†the EA’s ¬†email distribution list for future newsletters, they can do this by emailing them at this address (romneyschemes@environment-agency.gov.uk).

Write a comment

You need to login to post comments!

The Defend Our Coast website will be back soon.